We’re excited to share footage of our latest project with the University of Cambridge; the refurbishment of the Pavilion A roof at the Centre for Mathematical Sciences.
The project involves the replacement of an existing rooflight and green roof at the heart of the complex, improving the building’s performance. The new rooflight will appear as an elegant line of glass and steel, bringing greater light levels into the space beneath. The existing building, originally designed by Cullinan Studio, has been carefully considered throughout the design process; through which we hope to capture its quality and rigour within our contemporary intervention.
Gipping Construction are progressing well on site, with great attention to detail being carried out by glazing specialist Cantifix.
